NYC DDC

Project data

Client:                          

NYC DDC

 

Location:

Bayside, Queens

 

Project ID:

SEQ200486

 

Construction Value:

$1,578,044.38

 

Start Date:

12/12/2011

 

End Date:

07/23/2012

Position Held:

Resident Engineer

Project Description

Resident Engineer on this Infrastructure project for the NYC DDC borough of Queens that involved improvement to the infrastructure. This project included the installation of new storm and sanitary sewers and water mains in 33rd Road between 210th Street and 212th Street; 207th Street between 53rd Avenue and 56th Avenue; and 217th Street between 47th Road and 48th Avenue. Construction activities performed included the installation of new 8” DIP water mains, 10”/12”/15”/18” ESVP storm/sanitary sewers, manholes, catch basins, and asphalt roadway restoration.

Key Features

  1. Urban residential neighborhood

  2. 1,500 feet of 8” DIP water mains

  3. 1,400 feet of 10”/12”/15”/18” ESVP sewers

  4. Community Outreach

HUB Logo HD - Transparent.png

HUB Engineering, PLLC │ 733 Third Avenue │ 16th Floor │ New York, NY 10017

Tel: 1-855-HUB-ENGR (1-855-482-3647) │ Fax: 855-480-5020 │ Email: info@hubengineering.com 

©  2013 - 2024 by HUB Engineering, PLLC. All rights reserved.

Website designed by Abaad Beg

member.png
bottom of page